#5068 - 06/15/05 11:50 AM Job cost report
Barry French Offline
Adagio Fan

Registered: 02/05/04
Posts: 38
Loc: Kelowna, BC
Thank you for your response to my previous posting Andrew.

I need a report that provides by category and job total for a specific job or a series of jobs:

Budgeted cost
Actual cost
Variance (+ or -) between budgeted and actual cost

This is the most basic report I would expect from a job costing program and I am extremely disappointed that it was not included in the original release. It never crossed my mind that a report as basic as this would not be included.

When is the next release expected and what is the likelihood of having this report included?


Top
#5069 - 06/15/05 03:05 PM Re: Job cost report
Retired_Guy Offline
Adagio Master

Registered: 03/16/99
Posts: 10504
Loc: Canada
Hi Barry French,

What columns would you like displayed on the report? Would you need a subtotal on change of Phase too?


Top
#5070 - 06/15/05 03:41 PM Re: Job cost report
Barry French Offline
Adagio Fan

Registered: 02/05/04
Posts: 38
Loc: Kelowna, BC
Hi Andrew,

The columns I would like displayed on the report are (left to right):
1) Current direct cost estimate
2) Total direct cost incurred
3) Variance (+ or -)

No, I do not need a subtotal on change of Phase.

Thanks


Top
#5071 - 06/15/05 04:25 PM Re: Job cost report
Softrak Support Offline

Adagio Action Team

Registered: 03/09/99
Posts: 11572
Loc: Vancouver, BC Canada
Hi Barry,

The Direct Cost Analysis report will get you very close to what you are asking for. It prints the Original and Current Estimated cost for each job estimate, a percent complete and adjusted Current Estimated cost, the Total Cost Incurred, and a difference between Estimated and Actual Costs incurred. The report can be filtered to select only those estimates that have a certain % variance, and can be based on Total Cost, Unit Cost or Units.

I think the difference in what you are asking for and what this report provides is in the 'Adjusted Estimated Cost' (based on % complete) being compared to the Actual Cost incurred, rather than the 'raw' Current Estimated Amount.

Hopefully this may be useful in the interim.


Top
#5072 - 06/15/05 05:25 PM Re: Job cost report
Barry French Offline
Adagio Fan

Registered: 02/05/04
Posts: 38
Loc: Kelowna, BC
Thank you for your suggestions. I am aware of the direct cost analysis report but unfortunately a variance based on adjusted estimate provides no useful information for my purposes and the filters are not flexible enough to be able to work it into what I need.

When is the next release expected and what is the likelihood of having the report I have described included?


Top
#5073 - 06/15/05 09:14 PM Re: Job cost report
Steve Schwartz Offline
Adagio God

Registered: 03/10/02
Posts: 4516
Loc: Wynnewood, PA
Hi Barry

Not to be too apologetic for Softrak, but you shouldn't come down too hard on them on this issue. Their first priority in writing Adagio JobCost was to make sure that everything that was doable in ACCPAC Plus Job Cost was also doable in Adagio, and there was no such report in Plus JC. They went above and beyond this base requirement in the first release, just not in the reports area.

However, I agree that this should be a standard report, and when Softrak gets around to improving the reports, I hope they take your suggestion.

Steve Schwartz


Top


Moderator:  Christa_Meissner 
Who's Online
0 registered (), 115 Guests and 1 Spider online.
Key: Admin, Global Mod, Mod
Forum Stats
1865 Members
5 Forums
14487 Topics
70742 Posts

Max Online: 432 @ 01/20/25 10:17 PM
May
Su M Tu W Th F Sa
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31