A client is setting up PO to work with Inventory.
They purchase the same item from two different vendors at different times at two different costs. When entering a new PO, they want the default cost to be the last cost for that vendor.
So say they bought item A at $10.00 from Vendor X, then later at $11.00 from Vendor Y, and now they want to buy from Vendor X again. They want $10.00 to appear as the default cost.
I know there is something about using Alternate Price Lists that might be useful, but I have been fooling around with it and can't get it to work right.
Can somebody explain how to do this?
Another issue: They have standard instructions that they put on a PO to explain to the vendor what to do with each item prior to shipping it. They have been using the four lines of additional comments on the item master, and then recalling those comments into the PO. It works well. The problem is that when they purchase the same item from a different vendor, the instructions are different (for the same item). They have to override the original instructions, and that is subject to user error. Is there a better way to handle this?
Steve