#49663 - 04/19/1609:17 AMRe: Manual proration of MC in PO 9.2A
[Re: Victor B.]
Douglas Dickie
Adagio God
Registered: 06/02/99
Posts: 4414
Loc: Vancouver, BC
Victor
Why are you doing manual allocation in the first place? Is the error resulting from an auto proration significant enough to justify the cost of your time to do the manual proration?
_________________________
Douglas Dickie AccSys Solutions Inc Phone: 1.888.534.4344 ddickie@accsyssolutions.com