Hi,
I believe the message or locking is caused by POA with respect to End of Day Processing. POA creates a Job Cost batch directly into Adagio Job Costing (not manually retrieved), and the exclusive locking of the batch processing in job costing is the cause of the reported message. As soon as the EOD is completed, the locking should be released.
Brian
_________________________
Brian Stief,CPA,CA
Stief Group www.stiefgroup.com
Link2 Systems www.link2systems.com
800.540.3164