A client wants to assemble components whose costing method is Standard, and have the cost of the assembled master item equal the sum of the standard costs of the components.
Is this possible in Adagio?
I did some testing, and no matter what configuration I chose, Adagio kept using the average cost of the components.
Thanks
Steve