After closing the 2009 GL, I imported the 2010 Budget. The import function correctly displayed the year as 2010-; however, the budget information was posted to 2009 instead.
I subsequently re-imported the 2009 budget following the same procedures and this time is imported the date in 2010.
I now need to change both the 2009 and 2010 budget values but the import function does not allow me to change the default year. How can I proceed?