We have many jobs set up in Job Cost that are continually in progress and we bill them once a month or so. Is there an easy way that I can pull only the jobs that we need to bill, based on whether there was any activity on them in the previous month? I am currently keeping track outside of Job Cost and would really rather have a way to pull the info on what needs to be billed directed from the program.