Hi:

No, the Payables SP is 050112 which I installed back in the Spring. They say that no updates have been installed and I believe them.

I was wondering if, for instance, logic is built into the Payables start-up so that it looks for the existence of JC files and, if missing, changes the interface. Having said that, it appears that the appropriate files were always in place. Could there be any similar logic involved?

Since they are still using ACCPAC Plus JC and PR, the change could have come from that direction I suppose.

Thanks.