That worked.
I ran setup.exe from Phase2 folder. Then I ran the upgrade (RP1P20100630.EXE). Completed successfully.
For clarification on any future installs - Should running StartRP.EXE from the unzipped folder perform both the Crystal designer install, as well as the "for Adagio" component, assuming on a fresh workstation?
Thanks again for the assistance.
_________________________
Ryan Brohman
Kitchener, ON