Hi Zoe
Using an incorrect past date is not a problem. Simply edit the error batch, changing the period (but not the date) from period 99 to a valid fiscal period, then post.
Once you fix the error and post, the GL will agree to your AP. There is nothing you need to do in AP itself.
Steve
PS - If the incorrect date was a future date, that's a much more difficult problem to fix.