Posted by: Berisa
Adjusting Master Assembly in Inventory Control - 07/30/20 11:29 AM
Hi,
I have assembled an item then realised that three of the assembly items (raw materials) I entered in L vs KG. How can I correct the master item and the related three that are incorrect?
Thank you.
Berisa
I have assembled an item then realised that three of the assembly items (raw materials) I entered in L vs KG. How can I correct the master item and the related three that are incorrect?
Thank you.
Berisa