|
|
|
|
Joined: Jun 2019
Posts: 18
Adagio Groupie
|
|
Adagio Groupie
Joined: Jun 2019
Posts: 18 |
Are sub-assemblies possible on Adagio IC? Everyday I have to manually assemble items on IC that were used as an item for a master item. Is it not possible, like many other ERPs, that if an item needs to be assembled which, in turn, needed to assemble a Master Item to have it automatically assembled? AKA sub-assemblies?
|
|
|
|
|
Joined: Sep 2006
Posts: 818
Adagio Expert
|
|
Adagio Expert
Joined: Sep 2006
Posts: 818 |
Which modules do you have? Do you have inventory and Bill of Materials (BOM)?
Eva Froese ChoiceTech Accounting Solutions eva@choicetech.ca
|
|
|
|
|
Joined: Jun 2019
Posts: 18
Adagio Groupie
|
|
Adagio Groupie
Joined: Jun 2019
Posts: 18 |
|
|
|
|
|
Joined: Jun 1999
Posts: 4,506
Adagio God
|
|
Adagio God
Joined: Jun 1999
Posts: 4,506 |
The Bill of Materials add-on should do what you are looking for.
|
|
|
|
|
Joined: Jun 2019
Posts: 18
Adagio Groupie
|
|
Adagio Groupie
Joined: Jun 2019
Posts: 18 |
We have the BOM add on, is there some box I have to click somewhere to activate sub-assemblies?
|
|
|
|
|
Joined: Sep 2006
Posts: 818
Adagio Expert
|
|
Adagio Expert
Joined: Sep 2006
Posts: 818 |
If it is installed, you should see it under the edit menu. Create your Master items and your component items.
Eva Froese ChoiceTech Accounting Solutions eva@choicetech.ca
|
|
|
|
|
Joined: Mar 2002
Posts: 4,571
Adagio God
|
|
Adagio God
Joined: Mar 2002
Posts: 4,571 |
If you would like to build a finished product that is made up of other assemblies (ie sub-assemblies) in one shot, then the answer is no.
You have to first build the sub-assemblies, and then in a separate step build the finished product. Not even Adagio BOM can do this.
Steve
|
|
|
|
|
Joined: Jun 2019
Posts: 18
Adagio Groupie
|
|
Adagio Groupie
Joined: Jun 2019
Posts: 18 |
Thanks Steve, that is what I have experienced.Unfortunatly this is problematic. The master item assembly is triggered when the invoice is generated leaving the sub assembled components in a negative until they are manually handled. In our business, the sub-assembled pieces are usually pretty simple with some raw material and labour allocated to them. I have seen other ERPs auto build components of a Master Item that require assembly. Basically the ERP knows that if a component is not in stock and it is an item that requires assembly, then it will build it before satisfying the assembly of the Master item upon the the invoicing.
|
|
|
|
|
Joined: Mar 2002
Posts: 4,571
Adagio God
|
|
Adagio God
Joined: Mar 2002
Posts: 4,571 |
You have to compare features in a product with other products in the same price range.
But you are correct- automatic multi-level assemblies would be a welcome addition to Adagio.
Steve
|
|
|
|
|
Joined: Jun 1999
Posts: 4,506
Adagio God
|
|
Adagio God
Joined: Jun 1999
Posts: 4,506 |
I think the reason I thought the feature was there is because it was for ACCPAC Plus (either that or I'm thinking of some other product).
|
|
|
|
0 members (),
70
guests, and
2
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
|
Forums5
Topics14,679
Posts71,625
Members1,874
| |
Most Online1,408 Dec 9th, 2025
|
|
|
S |
M |
T |
W |
T |
F |
S |
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
|
8
|
9
|
10
|
11
|
12
|
13
|
14
|
|
15
|
16
|
17
|
18
|
19
|
20
|
21
|
|
22
|
23
|
24
|
25
|
26
|
27
|
28
|
|
29
|
30
|
|
|
|
|
|
|
|
|
|
|