Previous Thread
Next Thread
Print Thread
Page 1 of 2 1 2
#66290 06/14/21 01:15 PM
Joined: Jun 2019
Posts: 18
G
Adagio Groupie
Adagio Groupie
G Offline
Joined: Jun 2019
Posts: 18
Are sub-assemblies possible on Adagio IC? Everyday I have to manually assemble items on IC that were used as an item for a master item.
Is it not possible, like many other ERPs, that if an item needs to be assembled which, in turn, needed to assemble a Master Item to have it automatically assembled? AKA sub-assemblies?

Joined: Sep 2006
Posts: 818
E
Adagio Expert
Adagio Expert
E Offline
Joined: Sep 2006
Posts: 818
Which modules do you have? Do you have inventory and Bill of Materials (BOM)?


Eva Froese
ChoiceTech Accounting Solutions
eva@choicetech.ca
Joined: Jun 2019
Posts: 18
G
Adagio Groupie
Adagio Groupie
G Offline
Joined: Jun 2019
Posts: 18
Yes we have both

Joined: Jun 1999
Posts: 4,506
Adagio God
Adagio God
Joined: Jun 1999
Posts: 4,506
The Bill of Materials add-on should do what you are looking for.


Douglas Dickie
AccSys Solutions Inc
Phone: 1.888.534.4344
ddickie@accsyssolutions.com
Joined: Jun 2019
Posts: 18
G
Adagio Groupie
Adagio Groupie
G Offline
Joined: Jun 2019
Posts: 18
We have the BOM add on, is there some box I have to click somewhere to activate sub-assemblies?

Joined: Sep 2006
Posts: 818
E
Adagio Expert
Adagio Expert
E Offline
Joined: Sep 2006
Posts: 818
If it is installed, you should see it under the edit menu. Create your Master items and your component items.


Eva Froese
ChoiceTech Accounting Solutions
eva@choicetech.ca
Joined: Mar 2002
Posts: 4,571
Adagio God
Adagio God
Joined: Mar 2002
Posts: 4,571
If you would like to build a finished product that is made up of other assemblies (ie sub-assemblies) in one shot, then the answer is no.

You have to first build the sub-assemblies, and then in a separate step build the finished product. Not even Adagio BOM can do this.

Steve

Joined: Jun 2019
Posts: 18
G
Adagio Groupie
Adagio Groupie
G Offline
Joined: Jun 2019
Posts: 18
Thanks Steve, that is what I have experienced.Unfortunatly this is problematic. The master item assembly is triggered when the invoice is generated leaving the sub assembled components in a negative until they are manually handled.
In our business, the sub-assembled pieces are usually pretty simple with some raw material and labour allocated to them.
I have seen other ERPs auto build components of a Master Item that require assembly. Basically the ERP knows that if a component is not in stock and it is an item that requires assembly, then it will build it before satisfying the assembly of the Master item upon the the invoicing.

Joined: Mar 2002
Posts: 4,571
Adagio God
Adagio God
Joined: Mar 2002
Posts: 4,571
You have to compare features in a product with other products in the same price range.

But you are correct- automatic multi-level assemblies would be a welcome addition to Adagio.

Steve

Joined: Jun 1999
Posts: 4,506
Adagio God
Adagio God
Joined: Jun 1999
Posts: 4,506
I think the reason I thought the feature was there is because it was for ACCPAC Plus (either that or I'm thinking of some other product).


Douglas Dickie
AccSys Solutions Inc
Phone: 1.888.534.4344
ddickie@accsyssolutions.com
Page 1 of 2 1 2

Moderated by  Softrak Support 

Link Copied to Clipboard
Who's Online Now
0 members (), 70 guests, and 2 robots.
Key: Admin, Global Mod, Mod
Forum Statistics
Forums5
Topics14,679
Posts71,625
Members1,874
Most Online1,408
Dec 9th, 2025
November
S M T W T F S
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
Powered by UBB.threads™ PHP Forum Software 8.0.0