Hi All,
I'd like to add non-product items to our bills of material in Adagio IC (we are using 8.1B 100310). Things like Trim Labour, CNC Labour, Shipping Charge etc.
This will allow me to more easily roll up all of my costs.
I do not want to stock these things in inventory though.
Can you please suggest a way to get this done?
Thanks,
Cam
|
|
|
|
|
Joined: Jun 1999
Posts: 4,506
Adagio God
|
|
Adagio God
Joined: Jun 1999
Posts: 4,506 |
Cam:
JobTracker by Island Micro Systems
|
|
|
|
|
Joined: Mar 2002
Posts: 4,571
Adagio God
|
|
Adagio God
Joined: Mar 2002
Posts: 4,571 |
If you must use Inventory, you can lump the costs as fixed and/or variable costs as part of the bill of material. In which case you would keep the underlying details of the costs in an Excel spreadsheet, and when they change, modify each bill of material accordingly.
|
|
|
|
|
Joined: Apr 2007
Posts: 384
Adagio Specialist
|
|
Adagio Specialist
Joined: Apr 2007
Posts: 384 |
Hmm, so there's no way to include sundry or non-stock items in BOMs?
|
|
|
|
|
Joined: Mar 1999
Posts: 10,504
Adagio Master
|
|
Adagio Master
Joined: Mar 1999
Posts: 10,504 |
No. Because every time you did an assembly, IC would have to stop and ask the particulars for each item.
Andrew Bates
|
|
|
|
|
Joined: Jun 2002
Posts: 276
Terry
|
|
Terry
Joined: Jun 2002
Posts: 276 |
Hi Cam,
JobTracker can include Trim Labour, CNC Labour, Shipping Charge, Shop charges, write up and write down charges etc or other items that are not inventoried. Inventory items plus labour miscellaneous and shop charges can be included on a job. The job can be manufactured to an inventory item BOM and the item can be sold using any Adagio invoicing product that can sell inventory items. Another module to purchase but it will address your requirements. Contact Doug Dickie above and I'm sure he can arrange for a demo at a mutually convenient time.
Terry
Terry IMS Island Microsystems Ltd 250 287-9874 terry@islandmicro.com www.islandmicro.comIMS Applications: CounterSales . JobTracker . POTracker . LabelPrint . LotTracker . SerialTracker . IMScheduler . ReportGen JobTracker can now use ServiceTracker to track jobs performed on Equipment and Machines. Call for more information on our applications or to arrange a Demo.
|
|
|
|
|
Joined: Apr 2006
Posts: 1,757
Waterloo Guy
|
|
Waterloo Guy
Joined: Apr 2006
Posts: 1,757 |
It would be wonderful if the BOM's in Adagio did allow for non-stock items to be part of the BOM rollup. For example items of packaging or consumables that are costs but not tracked in inventory with quantities, or definable labour costs.
Currently there is a prompt for showing items that are not available and if enabled will stop on each item not available. Ok, so now we see most clients using our gridview which displays the quantities not on hand prior to doing the assembly, rather than prompting when doing the assembly process. Like, what are you going to do if the component item is not in stock and you need to complete the assembly?
Making the non-stock items part of the BOM processing would be a nice feature and as Terry shows, is practical and necessary.
Best, Brian
|
|
|
|
|
Joined: Jun 2002
Posts: 276
Terry
|
|
Terry
Joined: Jun 2002
Posts: 276 |
With JobTracker, it is the BOM and can be manufactured to a stock, or one off non-stock item. If manufacturing to a non-stock item, the item should be sold before manufacturing another job to the same item. If the job is manufactured to a stocking item, the costing method for the item will be observed. Also, a group of jobs organized as an object can be manufactured to an item, allowing even more flexibility in a custom manufacturing environment. JobTracker is a different approach to BOM, BOM is not it's primary focus, however it is probably the most flexible approach to Bill of Materials processing available to Adagio. JobTracker is designed to track parts, labour, shop materials, raw material and miscellaneous items required to complete a job, project, task or activity from start to completion recording status changes as the job progresses. For more information, ask Doug or Brian to arrange a webinar demo at a mutually convenient time.
Terry IMS Island Microsystems Ltd 250 287-9874 terry@islandmicro.com www.islandmicro.comIMS Applications: CounterSales . JobTracker . POTracker . LabelPrint . LotTracker . SerialTracker . IMScheduler . ReportGen JobTracker can now use ServiceTracker to track jobs performed on Equipment and Machines. Call for more information on our applications or to arrange a Demo.
|
|
|
|
|
Joined: Jan 2004
Posts: 42
Adagio Graduate
|
|
Adagio Graduate
Joined: Jan 2004
Posts: 42 |
A late entry to the discussion...
Two other options (maybe) for non-stock
Option 1 Can we have an item with a standard cost of $1 in the assembly and have that cost add to the assembled cost? The actual cost would be $0, so the entry would be to inventory and the variance account... If you want to add $10 assembly cost to the item, you would add 10 of these items to the assembly
Option 2 create a labour inventory item - avg cost create a new account set - labour point the inventory control account to the 'applied labour' account in your gl Do an adjustment to inventory to add 1,000,000 labour hours - dr and cr to the 'applied labour' account.(net $0 to GL) every time an assembly is done, the applied labour account is credited and the inventory account is debited.
HBM Integrated Technology Inc.
|
|
|
|
0 members (),
119
guests, and
3
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
|
Forums5
Topics14,680
Posts71,645
Members1,874
| |
Most Online1,408 Dec 9th, 2025
|
|
|
S |
M |
T |
W |
T |
F |
S |
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
|
8
|
9
|
10
|
11
|
12
|
13
|
14
|
|
15
|
16
|
17
|
18
|
19
|
20
|
21
|
|
22
|
23
|
24
|
25
|
26
|
27
|
28
|
|
29
|
30
|
|
|
|
|
|
|
|
|